SAP PP Online Quiz



Following quiz provides Multiple Choice Questions (MCQs) related to SAP PP. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Questions and Answers

Q 1 - In Material Requirement Planning, which of the following table contains document header data?

A - MDKP

B - MDTB

C - MDVM

D - MDFD

Answer : A

Explanation

MDKP Document Header data

MDTB Table Structure

MDVM Planning File Details

MDFD MRP Date details

Q 2 - In SAP Production Planning, how many BOMs can be created as per material type?

A - 100

B - 99

C - 50

D - 49

Answer : B

Answer : E

Q 4 - Which of the following Planning strategy is used to produce stock without Sales Order?

A - Make to Order

B - Make to Stock

C - Both of These

D - None of these

Answer : B

Q 5 - Which of the following module of PP is used to fill demand and supply gap?

A - BOM

B - MRP

C - Work Center

D - Routing

Answer : B

Explanation

MRP run or planning run is an engine which is used to fill demand and supply gap.

Q 6 - Which of the following Transaction code is used to display Production Lot?

A - MDL5

B - MDL3

C - MDL1

D - MEL1

Answer : B

Q 7 - Simulative planning is performed only for long duration and it is not performed for short term and when there is no time restriction?

A - True

B - False

Answer : B

Q 8 - When raw material is consumed to produce material as per Production order, to perform goods issue movement type is?

A - 251

B - 101

C - 261

D - 103

Answer : C

Explanation

In SAP PP, goods issue is done when raw material is consumed to produce material as per Production order. When goods are issued, system decreases the inventory of components at the storage location in Production Planning system.

Movement type 261 is used for goods issue.

Q 9 - Material Requirement Planning can be performed at?

A - Single Item single Level & Plant

B - Routing Level

C - None of the above

D - All of these

Answer : A

Q 10 - To set your PIR version active, which of the below value should be used to specify requirement would be considered in material requirement planning?

A - 00

B - 01

C - 02

D - 03

Answer : A

Explanation

In SAP PP, demand management is performed by Planned Independent requirement PIR. Planned Independent requirement provides input for production planning. A PIR contains one planned quantity of product and one date for material or a planned quantity is split over a span of time period.

To set your PIR version active use value 00 to specify requirement would be considered in material requirement planning. To maintain number of versions of planned independent requirement, you can set some numbers to active and others to inactive.